In the ever-evolving landscape of beverage manufacturing, staying ahead requires not only innovation in products but also in the operational backbone that keeps the business flowing. Mark Anthony Brewing Inc., the genius behind White Claw® Hard Seltzer and Mike’s® Hard Lemonade, recognized this need and embarked on a transformative journey with Velostics appointment scheduling. The results? Nothing short of spectacular.
Mark Anthony Brewing boasts a portfolio featuring some of the most sought-after beverage brands, including White Claw® Hard Seltzer, Mike’s® Hard Lemonade, Mike’s HARDER®, Cayman Jack®, and MXD Cocktails. With such a stellar lineup, the pressure to optimize every aspect of the production and distribution process is immense.
For a company rapidly expanding across 90+ suppliers and various geographies, the need to streamline operations became critical. Mark Anthony Brewing faced the challenge of eliminating manual processes that were not only time-consuming and error-prone but also hindered effective communication between teams.
Mark Anthony Brewing made a strategic move by adopting Velostics, empowering suppliers and partners to schedule appointments seamlessly through an intuitive interface. The impact was profound:
Watch the case study webinar to delve deeper into the success story of Mark Anthony Brewing's logistical transformation.